Stages of kitchen renovation in Dubai
Demolition of old kitchen and finishes. Plumbing and electrical work. Floor tiling or new flooring. Kitchen unit installation. Appliance fitting. Final finishes and painting.
Kitchen renovation costs in Dubai 2026
Cosmetic refresh (painting, new cabinet fronts): 5,000–12,000 AED. Mid-range renovation with new tiling and appliances: 20,000–45,000 AED. Full renovation with layout changes: 50,000–100,000 AED.
Where you can save money
- Keep the existing layout — saves 15–20%
- Choose local tiles over imported — saves 30–40%
- Buy an IKEA kitchen — 2–3x cheaper than custom-made
Kitchen renovation timeline
Cosmetic refresh: 5–7 days. Mid-range renovation: 3–5 weeks. Full renovation with layout changes: 6–10 weeks. Rental properties require landlord approval first.
How to choose a contractor
Check their portfolio of real completed work. Always get a written itemised quote. Clarify who purchases materials. Dubai Vista manages kitchen renovations end-to-end with quality guarantee.