Kitchen Renovation in Dubai: Stages, Costs and Timeline

Stages of kitchen renovation in Dubai

Demolition of old kitchen and finishes. Plumbing and electrical work. Floor tiling or new flooring. Kitchen unit installation. Appliance fitting. Final finishes and painting.

Kitchen renovation costs in Dubai 2026

Cosmetic refresh (painting, new cabinet fronts): 5,000–12,000 AED. Mid-range renovation with new tiling and appliances: 20,000–45,000 AED. Full renovation with layout changes: 50,000–100,000 AED.

Where you can save money

  • Keep the existing layout — saves 15–20%
  • Choose local tiles over imported — saves 30–40%
  • Buy an IKEA kitchen — 2–3x cheaper than custom-made

Kitchen renovation timeline

Cosmetic refresh: 5–7 days. Mid-range renovation: 3–5 weeks. Full renovation with layout changes: 6–10 weeks. Rental properties require landlord approval first.

How to choose a contractor

Check their portfolio of real completed work. Always get a written itemised quote. Clarify who purchases materials. Dubai Vista manages kitchen renovations end-to-end with quality guarantee.

Leave a Comment